1. Tompkins, J.A., White, J.A., Bozer, Y.A., and Tanchoco, J.M.A. (2010). Facility Planning, John Wiley & Sons. [4th ed.].
2. Gustaffson, V., and Davidsson, S. (2011). Streamlining the Invisible Value Chain—Reduction of Losses within Administrative Processes: A Case Study, Linnaeus University, School of Engineering.
3. Khanna, R.B. (2015). Production and Operations Management, PHI Learning Private Limited. [2nd ed.].
4. Determination of allowance time by work sampling and heart rate in manufacturing plant in Juarez Mexico;Garcia;J. Eng.,2019
5. Methodology to determine time allowance by work sampling using heart rate;Garcia;Procedia. Manuf.,2015