1. Numerical Simulation of Zhenyuan Gold Mine Blasting Parameters;Jiang;Blasting,2019
2. Analysis on Causes of Producing Boulder in Medium-length Hole Blasting and the Technical Measures for Reducing Boulder Yield;Gen;Min. Res. Dev.,2011
3. Nonlinear Prediction of Mefium-depth Hole Blasting Effects;Zhao;Min. Metall. Eng.,2010
4. Optimization Study on Mid-length Hole BlastParameters in Rongguan No. 1 Mine;Ren;Blasting,2011
5. Optimal positioning of vibration monitoring instruments and their impact on blast-induced seismic influence results;Arch. Min. Sci.,2019