Schedules Optimization with the Use of Value Engineering and NPV Maximization

Author:

Rosłon JerzyORCID,Książek-Nowak Mariola,Nowak PawełORCID

Abstract

Construction program, spatial, architectural, and structural decisions taken in the early stages of a project have a significant impact on meeting the goals and needs of the client. The use of principles and methods of value management allows for an in-depth analysis of the project assumptions from the investor’s perspective and leads to the best ratio of the project’s utility value/sustainability to the price of its implementation. However, analysis of literature sources allows to state that optimization of the economic value of the project takes place only in the preimplementation phase of the project. This paper presents the original concept of combining issues of construction project’s utility and economic value optimization. The model enables the maximization of the utility value of the subject of the project, taking into account its economic parameters. To support the implementation of the model, a schedule optimization procedure was developed using metaheuristic algorithm. The model was demonstrated on the basis of a case study. The presented proprietary approach to optimize the construction schedule taking into account the economic and sustainability of a construction project can be used in “design and build” projects, with particular emphasis on projects managed in the sustainable Project Management system.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development

Reference35 articles.

1. A two-level genetic algorithm for the multi-mode resource-constrained project scheduling problem;Magalhães-Mendes;Int. J. Syst. Appl. Eng. Dev.,2011

2. Construction project scheduling with imprecisely defined constraints;Kulejewski;Technol. J. Const.,2010

3. Project Scheduling—Recent Models, Algorithms and Applications;Węglarz,2012

4. A review of methods and algorithms for optimizing construction scheduling

5. Harmonogramowanie przedsięwzięć budowlanych z zastosowaniem algorytmów metaheurystycznych;Hejducki;Zeszyty Naukowe/Wyższa Szkoła Oficerska Wojsk Lądowych im. gen. T. Kościuszki.,2012

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3