Method of Site Selection and Capacity Setting for Battery Energy Storage System in Distribution Networks with Renewable Energy Sources

Author:

Peng Simin1,Zhu Liyang1,Dou Zhenlan2,Liu Dandan1,Yang Ruixin3,Pecht Michael4ORCID

Affiliation:

1. School of Electrical Engineering, Yancheng Institute of Technology, Yancheng 224051, China

2. State Grid Shanghai Integrated Energy Service Co., Ltd., Shanghai 200023, China

3. School of Mechanical Engineering, Beijing Institute of Technology, Beijing 100081, China

4. Center for Advanced Life Cycle Engineering (CALCE), University of Maryland, College Park, MD 20742, USA

Abstract

The reasonable allocation of the battery energy storage system (BESS) in the distribution networks is an effective method that contributes to the renewable energy sources (RESs) connected to the power grid. However, the site and capacity of BESS optimized by the traditional genetic algorithm is usually inaccurate. In this paper, a power grid node load, which includes the daily load of wind power and solar energy, was studied. Aiming to minimize the average daily distribution networks loss with the power grid node load connected with RESs, a site selection and capacity setting model of BESS was built. To solve this model, a modified simulated annealing genetic algorithm was developed. In the developed method, the crossover probability and the mutation probability were modified by a double-threshold mutation probability control, which helped this genetic method to avoid trapping in local optima. Moreover, the cooling mechanism of simulated annealing method was presented to accelerate the convergence speed of the improved genetic algorithm. The simulation results showed that the convergence speed using the developed method can be accelerated in different number BESSs and the convergence time was shortened into 35 iteration times in view of networks loss, which reduced the convergence time by about 30 percent. Finally, the required number of battery system in BESS was further built according to the real batteries grouping design and the required capacity of BESS attained using the developed method.

Funder

Jiangsu University “Qinglan Project”

Yancheng Institute of Technology

National Grid Corporation Science and Technology Project of China

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3