Numerical Study of the Layered Blasting Effect on a Cemented Backfill Stope

Author:

Li ZongnanORCID,Yu Bin,Guo LijieORCID,Xu Wenyuan,Zhao YueORCID,Peng XiaopengORCID

Abstract

The sublevel open stoping with backfill method has recently been widely used in underground metal mines. The primary CPB stope is frequently affected by blasting in the secondary ore stope, leading to stope collapse and ore dilution, which has become a common problem and has received widespread attention. Numerical simulations are carried out in the present work, and a 1/4 numeral model consisting of a primary CPB stope and a secondary ore stope is built. The secondary ore stope is divided into four layers on average in the simulation model, and the incident stress induced by each blasting at the interface of the CPB and ore is simulated. The results show that the CPB stope in the range within the height of the explosive charge induced horizontal compressive stress and tensile stress induced from the explosive charge height, while the mined section under the charge height has no obvious blasting impact. The maximum incident compressive stress is close to 1.2 MPa and occurs in the area closest to the blast hole The maximum induced tensile stress occurs in the range above the charge height, which is about 0.2 MPa. The stress ratios of the four-layered lift blasts are 3.6%, 3.8%, 4.0%, and 4.8%, respectively, showing a slight cumulative effect of layered blasting. In addition, the positive correlation between incident stress and the stress ratio is studied in the present work, and the results show that the greater the incident stress is, the greater the incident ratio is.

Funder

the National Key R&D Program of China

the National Natural Science Foundation of China

the Key Research Fund of BGRIMM

Publisher

MDPI AG

Subject

General Materials Science,Metals and Alloys

Reference63 articles.

1. Large-scale and small-scale mining in Peru: Exploring the interface;Cano;Resour. Policy,2022

2. Investigation of the short-term stress distribution in stopes and drifts backfilled with cemented paste backfill;Pengyu;Int. J. Min. Sci. Technol.,2015

3. Hustrulid, W.A., and Bullock, R. (2001). Underground Mining Methods: Engineering Fundamentals and International Case Studies, Society for Mining, Metallurgy, and Exploration.

4. Geotechnical considerations in mine backfilling in Australia;Sivakugan;J. Clean. Prod.,2006

5. Rybak, J., Kongar-Syuryun, C., Tyulyaeva, Y., and Khayrutdinov, A.M. (2021). Creation of Backfill Materials Based on Industrial Waste. Minerals, 11.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3