Abstract
The sublevel open stoping with backfill method has recently been widely used in underground metal mines. The primary CPB stope is frequently affected by blasting in the secondary ore stope, leading to stope collapse and ore dilution, which has become a common problem and has received widespread attention. Numerical simulations are carried out in the present work, and a 1/4 numeral model consisting of a primary CPB stope and a secondary ore stope is built. The secondary ore stope is divided into four layers on average in the simulation model, and the incident stress induced by each blasting at the interface of the CPB and ore is simulated. The results show that the CPB stope in the range within the height of the explosive charge induced horizontal compressive stress and tensile stress induced from the explosive charge height, while the mined section under the charge height has no obvious blasting impact. The maximum incident compressive stress is close to 1.2 MPa and occurs in the area closest to the blast hole The maximum induced tensile stress occurs in the range above the charge height, which is about 0.2 MPa. The stress ratios of the four-layered lift blasts are 3.6%, 3.8%, 4.0%, and 4.8%, respectively, showing a slight cumulative effect of layered blasting. In addition, the positive correlation between incident stress and the stress ratio is studied in the present work, and the results show that the greater the incident stress is, the greater the incident ratio is.
Funder
the National Key R&D Program of China
the National Natural Science Foundation of China
the Key Research Fund of BGRIMM
Subject
General Materials Science,Metals and Alloys
Reference63 articles.
1. Large-scale and small-scale mining in Peru: Exploring the interface;Cano;Resour. Policy,2022
2. Investigation of the short-term stress distribution in stopes and drifts backfilled with cemented paste backfill;Pengyu;Int. J. Min. Sci. Technol.,2015
3. Hustrulid, W.A., and Bullock, R. (2001). Underground Mining Methods: Engineering Fundamentals and International Case Studies, Society for Mining, Metallurgy, and Exploration.
4. Geotechnical considerations in mine backfilling in Australia;Sivakugan;J. Clean. Prod.,2006
5. Rybak, J., Kongar-Syuryun, C., Tyulyaeva, Y., and Khayrutdinov, A.M. (2021). Creation of Backfill Materials Based on Industrial Waste. Minerals, 11.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献