Abstract
The layout of the dewatering system in open-cast mining must be adapted to mining assumptions and to the size of expected inflows, which, in turn, depend on natural conditions and the operation of other mines and groundwater intakes, affecting the arrangement of the hydrodynamic field. This case study analyses possible dewatering solutions related to a change in the mining drainage system: decommissioning by flooding of a depleted deposit and dewatering of a new one located in the vicinity. As part of numerical modelling, a solution was sought to minimise the environmental impact of drainage. Forecast calculations for two drainage alternatives were made. One of the solutions follows the classic approach: independent dewatering of the new excavation. The second solution assumes the recirculation of waters from dewatering of the new mine through their discharge into a closed and flooded pit located in the vicinity. The results of the forecasts for both variants point to the modification of the hydrodynamic field resulting from expected volumes of inflows and different environmental effects. The use of numerical simulations assisted the selection of the optimal dewatering solution.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献