Abstract
An expressway interchange bridge was completed in 2016 in China. In 2019, disease phenomenon, including pier inclination, excessive support slip, and expansion joint damage, were found in the ramp bridge, which influenced the bridge safety and operation. This article conducts a forensic engineering field investigation and uses finite element modeling, revealing the process of disease occurrence according to the displacement cooperation relations in the pier–support–girder region. This research concludes that the main technical causes of the bridge’s disease include: (1) eccentric compression on the pier during construction and operation due to an improper design change and the asynchronous construction process; (2) asymmetric foundation settlement caused by the temporary load during construction and the weight of the filling soil during operation. Finally, the ethical factors leading to the disease are summarized based on technical causes, which can alert professional engineers to problems that should be considered in the design and construction of high-pier bridges with a soft foundation.
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference37 articles.
1. Evolution Law of Pier Top Displacement of Existing Pier Considering the Construction Process of Adjacent Road;Wang;J. Chongqing Jiaotong Univ. (Nat. Sci.),2021
2. Influence of temporary construction road and surcharge on the deformation of high-speed railway pier in soft soil area;He;J. China Foreign Highw.,2021
3. Study of displacement of bridge pier and abutment foundation caused by earth piling load and its prevention technique;Feng;China J. Highw. Transp.,2004
4. Study on Disease Detection and Reinforcement of Bridge Pier Column
5. Unexpected Cracking in an RC Bridge Pier Cap—A Case Study;Geevar,2021
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献