Affiliation:
1. Department of Industrial Engineering, Faculty of Mechanical Engineering, University of Žilina, Univerzitná 8215/1, 01026 Žilina, Slovakia
Abstract
The Demand-Driven Material Resource Planning (DDMRP) method is one of the newer methods of inventory management in an enterprise. Its creation was initiated by a change in the business environment and the characteristics of today’s supply chains. DDMRP brings a combined pull/push approach to inventory management based on creating strategic stacks in the supply chain and managing inventory at these strategic points based on customer orders. The DDMRP system provides a simple methodology that is easy to apply, even in smaller businesses, without the need for advanced information systems. However, a simple methodology also has its limitations because, in many cases, intuitive and subjective approaches are used to set inventory management parameters (variability factor, running time factor, seasonality factor, thresholds, etc.). Simplified parameter determination may, under certain conditions, lead to some storage tanks being too high or too low for certain periods of time. We know from classical inventory management, in the conditions of setting stack parameters in DDMRP, that the deficiency can be eliminated by the use of statistical–analytical approaches and optimisation techniques. This article deals with the issue of setting optimal values of storage tanks in DDMRP, while the correctness of the methodology is verified through simulation of the demand-driven planning process. The correctness and usability of the proposed approaches in sizing strategic reservoirs in DDMRP was confirmed through the results of stimulation experiments.
Funder
Slovak Research and Development Agency
Agency KEGA
Reference46 articles.
1. Pták, C., and Smith, C. (2011). Demand Driven Material Requirements Planning, Industrial Press, Inc.. [1st ed.].
2. Demand Driven Material Requirements Planning (DDMRP): A systematic review and classification;Azzamouri;J. Ind. Eng. Manag.,2021
3. Demand Driven MRP—The need to standardise an implementation process;Orue;Int. J. Prod. Manag. Eng.,2020
4. Effective production control in an automotive industry: MRP vs. demand-driven MRP;Shofa;AIP Conf. Proc.,2017
5. Kortabarria, A., and Elizburu, A. (2018, January 20–22). Implementing Management Systems and Demand Driven MRP concepts: A Project Based Learning experience in Industrial Organization Engineering. Proceedings of the 4th International Conference on Higher Education Advances (HEAd’18), Valencia, Spain.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献