Abstract
Minimizing the schedule length of parallel applications, which run on a heterogeneous multi-core system and are subject to energy consumption constraints, has recently attracted much attention. The key point of this problem is the strategy to pre-allocate the energy consumption of unscheduled tasks. Previous articles used the minimum value, average value or a power consumption weight value as the pre-allocation energy consumption of tasks. However, they all ignored the different levels of tasks. The tasks in different task levels have different impact on the overall schedule length when they are allocated the same energy consumption. Considering the task levels, we designed a novel task energy consumption pre-allocation strategy that is conducive to minimizing the scheduling time and developed a novel task schedule algorithm based on it. After getting the preliminary scheduling results, we also proposed a task execution frequency re-adjustment mechanism that can re-adjust the execution frequency of tasks, to further reduce the overall schedule length. We carried out a considerable number of experiments with practical parallel application models. The results of the experiments show that our method can reach better performance compared with the existing algorithms.
Subject
Electrical and Electronic Engineering,Computer Networks and Communications,Hardware and Architecture,Signal Processing,Control and Systems Engineering
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献