Feasibility Evaluation of Highwall Mining in Open-Pit Coal Mine Based on Method of Integrated Analytic Hierarchy Process–Fuzzy Comprehensive Evaluation–Variable Weight Theory

Author:

Song Dong123,Wang Bukang123,Pang Jifang4,Guo Zhifu123,Wang Anna4ORCID,Niu Yuge4

Affiliation:

1. China Coal Research Institute, Beijing 100013, China

2. Shanxi Tiandi Coal Machinery Co., Ltd., Taiyuan 030006, China

3. National Engineering Laboratory for Coal Mining & Excavation Machinery Equipment, Taiyuan 030006, China

4. School of Computer and Information Technology, Shanxi University, Taiyuan 030006, China

Abstract

Highwall mining is a method that involves using a continuous highwall miner system (CHM) to extract coal from the remaining coal seams, which has proven to be an effective and safe method for extracting coal after open-pit mining. However, application cases globally have shown that the feasibility of highwall mining in open-pit coal mines is subject to geological conditions, mining techniques, and other factors. If application conditions are not suitable, equipment may be trapped under collapsed coal–rock masses and unable to be retrieved, resulting in severe safety issues for slope stability. To meet the real-world demand for extracting the remaining coal in open-pit coal mines in China, it is urgent to conduct a feasibility evaluation of highwall mining in these areas. This paper establishes a mathematical evaluation framework for assessing the feasibility of highwall mining by summarizing a large number of engineering application cases globally and analyzing various technical characteristics such as geological deposit conditions, mining techniques, and technical equipment. The analytic hierarchy process (AHP), fuzzy comprehensive evaluation (FCE) and variable weight theory (VWT) are utilized in conjunction to form this framework, which includes four secondary indicators: geological deposit factors, mining technique factors, safety impact factors, and economic evaluation factors, and 20 tertiary sub-indicators, along with their corresponding characteristic values. The feasibility sub-set is divided into four categories: infeasible, basically feasible, relatively feasible, and highly feasible, and the values of the sub-indicators strictly follow and represent these four levels of feasibility. Weight vectors for the sub-indicators are obtained through a judgment matrix established within the mathematical evaluation framework. The fuzzy relationship matrix of the sub-indicators is constructed using fuzzy mathematical membership functions, and the final feasibility evaluation is determined through two-level comprehensive evaluation. The accuracy of the model is verified using the characteristic parameters of open-pit coal mines under two different conditions (JZT coal mine in Inner Mongolia, China, and GC coal mine in Australia). The results demonstrate that the maximum evaluation membership degree for the JZT mine is 0.7113, belonging to the “highly feasible” level, while the GC mine is 0.3304, belonging to the “basically feasible” level, which aligns well with real-world usage, proving that the evaluation model can effectively reveal the performance and membership degree of each indicator in different application cases. By quantitatively characterizing the feasibility level of highwall mining technology under different application conditions, this evaluation model can provide scientific guidance for coal mining enterprises to introduce CHM for highwall mining operation in open-pit coal mines.

Funder

China National Key R&D Program

Research Project Supported by Shanxi Scholarship Council of China

National Natural Science Foundation of China

National Undergraduate Innovation and Entrepreneurship Training Program

21st Undergraduate Innovation and Entrepreneurship Training Program of Shanxi University

Publisher

MDPI AG

Subject

Electrical and Electronic Engineering,Computer Networks and Communications,Hardware and Architecture,Signal Processing,Control and Systems Engineering

Reference41 articles.

1. Current situation, problems and countermeasures of intelligent evaluation of slope stability in open pit;Yang;J. China Coal Soc.,2020

2. Theoretical analysis of damaged width & instability mechanism of rib pillar in open-pit highwall mining;Wang;Adv. Civ. Eng.,2019

3. Research on exploiting residual coal around final end-walls by highwall mining system in China;Chen;Int. J. Min. Reclam. Environ.,2013

4. Review of highwall mining experience in Australia and a case study;Shen;Aust. Geomech.,2001

5. Application of highwall mining system to recover residual coal in End-walls;Shimada;Procedia Earth Planet. Sci.,2013

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3