An Intelligent Detection Method for Approach Distances of Large Construction Equipment in Substations

Author:

Wang Leixiong12,Wang Bo12,Zhang Jiaxin12,Ma Hengrui12,Luo Peng12,Yin Tianrui3

Affiliation:

1. Hubei Engineering and Technology Research Center for AC/DC Intelligent Distribution Network, School of Electrical Engineering and Automation, Wuhan University, Wuhan 430072, China

2. School of Electrical and Automation, Wuhan University, Wuhan 430072, China

3. School of Automation, Wuhan University of Technology, Wuhan 430070, China

Abstract

The safe approach distance detection of large construction equipment in substations is important to ensure the safety and stability of the power system, as well as to prevent equipment damage, power outages and other accidents. The current method is unable to intelligently distinguish construction equipment from power equipment and realize real-time safety approach distance detection. Therefore, this paper constructs a safety approach distance detection system for large-scale construction equipment in substations based on stereo vision and target detection, and realizes real-time high-precision safe approach distance detection between large-scale construction equipment and electric power equipment. Firstly, the system distinguishes construction equipment from power equipment using a GhostNet-based substation construction target detection model. Secondly, the system obtains spatial information regarding the operation scene using a lightweight stereo matching model based on channel attention, then calculates the spatial surface center of the target based on the spatial information and detection results, and finally calculates the safety approach distance between construction equipment and power equipment. Compared with MobileNetv3-YOLOv4, the map and the recall rate of the proposed method are improved by 13.1% and 29.0%; compared with the AnyNet stereo matching method, the proposed method decreases the end point error and 3 pixels error by 34.2% and 25.8%. The actual data show that the detection speed of the proposed method is 19.35 frames per second, and the mean absolute error is 0.942 m and the mean relative error is 3.802%. This method can accurately measure the safe approach distance in real time in real scenarios to guarantee the safety of personnel and equipment.

Funder

Major Science and Technology Special Project of Yunnan Provincial Science and Technology Department

Yunnan Provincial Science and Technology Department, China

Publisher

MDPI AG

Subject

Electrical and Electronic Engineering,Computer Networks and Communications,Hardware and Architecture,Signal Processing,Control and Systems Engineering

Reference41 articles.

1. Li, Q. (2012). Technical Manual of Lifting and Transportation Construction for Power Transmission and Transformation Projects, China Electric Power Press.

2. Optimization Strategy for Frequency Regulation Service of Regional Integrated Energy Systems Considering Compensation Effect of Frequency Regulation;Ma;Autom. Electr. Power Syst.,2018

3. A Power Operation Site Safety Assistant System Based on Convolutional Neural Network;Zhang;IOP Conf. Ser. Earth Environ. Sci.,2019

4. Safety image interpretation of power industry: Basic concepts and technical framework;Ma;Proc. CSEE,2022

5. State Grid Corporation of China (2008). Electricity Supply Enterprise Operation Safety Risk Identification and Prevention Manual, China Electric Power Press.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估