Abstract
The rapid and accurate evaluation of oil and gas assets, specifically for new development projects, poses a significant challenge due to the various project types, limited data availability, brief periods for assessment and decision making, and constraints arising from varying contractual and taxation conditions, political stability, and societal factors. This study leverages the grading standards of the evaluation index system for new oil and gas field development projects, along with relevant mathematical theories and methods for project evaluation and optimization. We developed an asset evaluation approach for new oil and gas projects by analyzing the assets of six new oil and gas field development projects in Brazil. This analysis resulted in the grading and ranking of new projects, and we tested and demonstrated four asset optimization techniques. After a comparative analysis with conventional evaluation results, we established an oil and gas project asset optimization approach centered on the cloud model comprehensive evaluation and linear weighted ranking, exhibiting Kendall’s tau coefficient of 0.8667 with conventional methods. The findings suggest that the combination of the cloud model comprehensive evaluation method with the linear weighted ranking method can facilitate asset optimization for oil and gas field development projects, meeting the practical needs for fast selection among various new projects. Furthermore, this research offers a technical and theoretical foundation for rapid evaluation and decision making regarding new assets.
Funder
Reservoir Evaluation and Intelligence System Construction for Overseas New Venture Projects of China National Petroleum Corporation
Guangdong Basic and Applied Basic Research Foundation
Subject
Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering
Reference39 articles.
1. A quantitative oil and gas reservoir evaluation system for development;Rui;J. Nat. Gas Sci. Eng.,2017
2. A fuzzy inference system applied to value of information assessment for oil and gas industry;Vilela;Decis. Mak. Appl. Manag. Eng.,2019
3. Using Relative Importance Index Method for Developing Risk Map in Oil and Gas Construction Projects;Kassem;J. Kejuruter.,2020
4. Bi, A., Huang, S., and Sun, X. (2023). Risk Assessment of Oil and Gas Pipeline Based on Vague Set-Weighted Set Pair Analysis Method. Mathematics, 11.
5. Risk identification and quantitative assessment method of offshore platform equipment;Ni;Energy Rep.,2022