Abstract
Background: Replenishment process is one of the success factors for a more efficient management of operations and a regained profitability. The application of the principles of lean manufacturing in the field of industrial logistics, where substantial improvements in the replenishment process are necessary, is relevant with the objective of optimising the replenishment flow of raw materials from assembly lines in order to propose and implement robust solutions capable of mitigating or even eliminating all types of waste and maximising the productivity of value-added activities. Methods: To achieve this goal, the paper follows the spirit of the DMAIC (Define, Measure, Analyse, Improve and Control) and 5-Why methods that allow the mapping of internal processes of factory logistics in the particular case of a Wire Harness Automotive Plant. Results: Based on the data collected, as well as on specific analysis methods, simulations are launched to challenge and validate the improvements made to the replenishment process. Conclusions: Several generalisable lessons are learnt regarding replenishment flow management, covering topics such as inventory traceability, in addition to logistics costs and process flow optimisation.
Reference54 articles.
1. Introduction to Materials Management;Chapman,2017
2. Sustainable operations management;Paul;Prod. Oper. Manag.,2005
3. Sustainability in manufacturing operations scheduling: A state of the art review
4. Sustainable operations-oriented painting process optimisation in automobile maintenance service
5. Seeing What’s Next: Using the Theories of Innovation to Predict Industry Change;Christensen,2004
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献