1. Application of 2000 MPa Parallel Wire Cables to Cable-Stayed Rail-cum-Road Bridge with Main Span Length over 1000 m;Hu;Bridge Constr.,2019
2. Key Techniques of 1960 MPa Steel Wire and Wire Strand for Main Cable of Second Humen Bridge;Wu;Bridge Constr.,2018
3. Study of Anchorage Design for 1860 MPa-Grade Stay Cables of Qingshan Changjiang River Highway Bridge in Wuhan;Wu;Bridge Constr.,2020
4. Hoop Prestressing Technique on Pylons of Wuhu Changjiang River Rail-cum-road Bridge on Shangqiu-Hefei-Hangzhou Railway;Wang;Bridge Constr.,2019
5. Construction Techniques for Stay Cables Provided with Isodirectionally Turning Stay Cable Anchor System;Li;Bridge Constr.,2015