Abstract
A risk-based approach to support water utilities in terms of defining pipe rehabilitation priorities is presented. In a risk analysis in the risk management process, the probability that a given event will happen and the consequences if it does happen have to be estimated and combined. In the quantitative risk analysis, numerical values are assigned to both consequence and probability. In this study, the risk event addressed was the inability to supply water due to pipe breaks. Therefore, on the probability side, the probability of pipes breaking was assessed, and on the consequence side, the reduced ability to satisfy the water demand (hydraulic reliability) due to pipe breakage was computed. Random Forest analysis was implemented for the probability side, while the Asset Vulnerability Analysis Toolkit was used to analyse the network’s hydraulic reliability. Pipes could then be ranked based on the corresponding risk magnitude, thereby feeding a risk evaluation step; at this step, decisions are made concerning which risks need treatment, and also concerning the treatment priorities, i.e., rehabilitation priorities. The water distribution network of Trondheim, Norway, was used as a case study area, and this study illustrates how the developed method aids the development of a risk-based rehabilitation plan.
Subject
Health, Toxicology and Mutagenesis,Public Health, Environmental and Occupational Health
Reference42 articles.
1. Water in the Post-2015 Development Agenda and Sustainable Development Goals. IHP/SDG-WATER/1/2014https://ideas.repec.org/s/ess/wpaper.html
2. Aging Water Distribution Systems
3. Infrastructure asset management of urban water systems;Alegre,2012
4. Comprehensive review of structural deterioration of water mains: statistical models
5. Prediction of Timing of Watermain Failure Using Gene Expression Models
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献