Abstract
Due to a lack of suitable methods, extraction of reporting requirements from lengthy construction contracts is often completed manually. Because of this, the time and costs associated with completing reporting requirements are often informally approximated, resulting in underestimations. Without a clear understanding of requirements, contractors are prevented from implementing improvements to reporting workflows prior to project execution. This study developed an automated reporting requirement identification and time–cost prediction framework to overcome this challenge. Reporting requirements are extracted using Natural Language Processing (NLP) and Machine Learning (ML), and stochastic simulations are used to predict overhead costs and durations associated with report preparation. Functionality and validity of the framework were demonstrated using real contracts, and an accuracy of over 95% was observed. This framework provides a tool to rapidly and efficiently retrieve requirements and quantify the time and costs associated with reporting, in turn providing necessary insights to streamline reporting workflows.
Funder
Natural Sciences and Engineering Research Council of Canada
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献