Construction Method of a Guaranteed Grid Considering the Specific Recovery Process

Author:

Zhang Shengfeng,Zhao JieORCID,Weng Yixuan,Liu Dichen,Ma Weizhe,Ma Yuhui

Abstract

For the planning of the guaranteed power grid, only the operation capacity of the target grid is considered. The recovery process and steps of the backbone grid are not considered enough, which leads to two defects: the minimum guaranteed power grid is not conducive to the unit recovery and the recovery time is too long. In this paper, a method of constructing the grid with the specific recovery process is proposed. Considering the influence of the grid structure and the position of the black start power supply on the recovery steps, the recovery success rate and the recovery time of the grid, the optimization of the grid structure of the guaranteed grid can meet the demand of power supply and at the same time make the recovery of the target grid less time-consuming and achieve a higher recovery success rate in the event of a blackout. In this method, two aspects are considered: the power failure recovery scenario in the recovery process of the target grid and the normal power supply scenario, reflecting the power supply performance after the recovery of the target grid. In the normal power supply scenario, a three-objective optimization model including power supply capacity, smooth transmission and safety margin is constructed, with power supply capacity and safe operation as constraints. In the scenario of power failure recovery, the process of power grid recovery and the mechanism affecting the success of recovery are analyzed to form the line recovery index. The Dijkstra algorithm is used to search for the optimal recovery path and calculate the recovery index, so as to reoptimize the backbone power grid. The validity of the method is verified by standard and practical examples.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development

Reference26 articles.

1. Analysis on Blackout in Great Britain Power Grid on August 9th, 2019 and its Enlightenment to Power Grid in China;Sun;Proc. CSEE,2019

2. Analysis of “3.21” blackout in Brazil and Its Enlightenment to China Power Grid;Yi;Power Syst. Autom.,2019

3. Field Experiences in Reenergization of Electrical Networks from Thermal and Hydro Units

4. Restoration project

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3