Abstract
This research introduces a stochastic version of the multi-mode resource-constrained project scheduling problem (MRCPSP) and its mathematical model. In addition, an efficient multi-start iterated local search (MS-ILS) algorithm, capable of solving the deterministic MRCPSP, is adapted to deal with the proposed stochastic version of the problem. For its deterministic version, the MRCPSP is an NP-hard optimization problem that has been widely studied. The problem deals with a trade-off between the amount of resources that each project activity requires and its duration. In the case of the proposed stochastic formulation, the execution times of the activities are uncertain. Benchmark instances of projects with 10, 20, 30, and 50 activities from well-known public libraries were adapted to create test instances. The adapted algorithm proved to be capable and efficient for solving the proposed stochastic problem.
Subject
General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献