Improvement of Assembly Manufacturing Process through Value Stream Mapping and Ranked Positional Weight: An Empirical Evidence from the Defense Industry

Author:

Achmadi Fandi1,Harsanto Budi2ORCID,Yunani Akhmad3

Affiliation:

1. Master of Management Program, Faculty of Economics and Business, Universitas Padjadjaran, Bandung 40132, Indonesia

2. Faculty of Economics and Business, Universitas Padjadjaran, Bandung 40132, Indonesia

3. Faculty of Communications and Business, Telkom University, Bandung 40257, Indonesia

Abstract

This study aims to improve the assembly manufacturing process to solve the workload imbalances by combining value stream mapping (VSM) and ranked positional weight (RPW). An empirical study was conducted in a defense manufacturing firm located in Indonesia. The study specifically focused on 155 components and 56 tasks distributed among 43 assembly workstations in one weapon product. The results of the analysis showed a significant reduction in the total cycle time, from 5121 s (85.35 min) to 3620 s (60.33 min), or a decrease of 29%. Additionally, the study found improvements in the balance of the assembly line as measured by balance delay, line efficiency, and smoothness index performance indicators. The application of VSM and RPW in this study is unique in the context of the defense industry, as it provides empirical analysis on cycle time and assembly line balance, which is rarely studied. The results of this study contribute to the advancement of literature in the field and provide valuable insights for other organizations in the defense industry and other manufacturing industries. By improving the efficiency and balance of the weapon assembly line, this study has the potential to increase productivity and reduce waste.

Funder

UNIVERSITAS PADJADJARAN

Publisher

MDPI AG

Subject

Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering

Reference33 articles.

1. Classification Scheme for Lean Manufacturing Tools;Pavnaskar;Int. J. Prod. Res.,2003

2. Value Stream Mapping to Reduce the Lead-Time of A Product Development Process;Tyagi;Int. J. Prod. Econ.,2015

3. Assembly Line Balancing Problem: A Comparative Evaluation of Heuristics and A Computational Assessment of Objectives;Fathi;J. Model. Manag.,2018

4. Analisis Cycle Time Proses Perakitan Senjata Di PT Pindad (Persero);Achmadi;J. Oper. Excell. J. Appl. Ind. Eng.,2021

5. The Importance of Pilot Study;Hundley;Soc. Res. Update,2001

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3