Affiliation:
1. Shandong Energy Group Xibei Mining Co., Ltd., Xi’an 710018, China
2. Shaanxi Zhengtong Coal Industry Co., Ltd., Xianyang 713600, China
3. School of Energy Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
Abstract
Many mines have introduced the tunnel boring machine (TBM) to improve the efficiency of rock tunneling because of its high propulsion capacity, safe working space, and intelligent equipment. In contrast, the operating environment of coal mines is often under complex geological conditions such as high ground stress, large depth of burial, high temperature, water damage, and large construction angles, making it difficult to apply traditional TBMs in coal mines. Taking the TBM of Gaojiapu Coal Mine of Zhengtong Coal Industry as an example, this paper introduces the coal mine adaptability transformation and construction technology optimization of the equipment, optimizes the design of the roadheader department of the equipment, increases the support operation space and reduces the empty roof distance, shortens the length of the whole machine and transforms the walking structure to enhance its maneuverability and convenience, and applies the monorail crane to the auxiliary transportation system of TBM. This paper proposes the theory of TBM tunneling disaster control in complex geology, research and discussion on TBM jamming, impact pressure, cooling prevention and control, and water damage in complex geological conditions. The results obtained were applied at the Zhengtong Coal Industry in engineering practice, resulting in an average monthly progress of more than 200 m, which is more than three times more efficient than full rock heaving, and also reduces the work intensity of tunneling personnel and promotes the development of coal mining. The final part of the article looks at the future application of TBMs in coal mining.
Funder
National Natural Science Foundation of China
Natural Science Basic Research Program Joint Fund Project of Shaanxi Provincial
Subject
Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering
Reference31 articles.
1. High-Quality Development of China’s Coal Industry;Kang;Strateg. Study CAE,2021
2. Development achievements of China’s coal industry during the 13th Five-Year Plan period and implementation path of “dual carbon” target;Wang;Coal Sci. Technol.,2021
3. Development opportunities of the coal industry towards the goal of carbon neutrality;Xie;J. China Coal Soc.,2021
4. Application and prospect of hard rock TBM for deep road way construction in coal mines;Huang;Tunn. Undergr. Space Technol.,2018
5. Present status and outlook of key technology for mine roadway heading equipment;Hao;Coal Sci. Technol.,2014
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献