Affiliation:
1. State Key Laboratory of Water Resources Engineering and Management, Wuhan University, Wuhan 430072, China
Abstract
The regulation of upstream cascade reservoirs has significantly altered the downstream hydrologic regime and should be taken into account in design flood estimation. The current flood regional composition (FRC) methods do not consider the unfavorable situations for reservoir flood control operation. In this paper, a novel framework, the most unfavorable flood regional composition (MUFRC) method, was proposed based on flood risk analysis to estimate design flood in the cascade reservoir operation period. The cascade reservoirs in the Yalong River basin were selected as a case study. The results indicated that (1) the proposed MUFRC method would allocate more flood volume to the downstream uncontrolled sub-basin, and the precise definition of flood disaster loss could have a significant impact on the MUFRC method for the rational estimation of design flood. (2) The 1000-year design flood peak, and 3-day and 7-day flood volumes at the outlet section estimated by the MUFRC method are 15,400 m3/s, 3.91, and 8.42 billion m3, respectively, which are higher than the values estimated by other FRC methods. (3) The flood control water level in the downstream reservoir can be adjusted for the reduction in design floods in the operation period, which can additionally generate 460 million kW·h (+1.82%) of hydropower during the flood season. A comparison study and sensitivity analysis further proved that the MUFRC method can rationally allocate flood volume while balancing the flood risk and comprehensive utilization benefits, which is worth further study and practical application.
Funder
National Natural Science Found of China
National Key Research and Development Plan
Reference28 articles.
1. Duan, W., Guo, S., Wang, J., and Liu, D. (2016). Impact of cascaded reservoirs group on flow regime in the middle and lower reaches of the Yangtze River. Water, 8.
2. Reservoir effects on flood peak discharge at the catchment scale;Volpi;Water Resour. Res.,2018
3. MWR (Ministry of Water Resources) (2006). Regulation for Calculating Design Flood of Water Resources and Hydropower Projects, (In Chinese).
4. Guo, S., Rizwan, M., Liu, Z., Xiong, F., and Yin, J. (2018). Design flood estimation methods for cascade reservoirs based on copulas. Water, 10.
5. A non-stationary cost-benefit based bivariate extreme flood estimation approach;Qi;J. Hydrol.,2018