Affiliation:
1. School of Management, Shanghai University, Shanghai 200444, China
2. School of Communication, East China University of Political Science and Law, Shanghai 201620, China
Abstract
With the increase in product varieties, the combination of supermarkets and tow trains is being adopted by more automobile manufacturers for part feeding, especially in mixed-flow assembly lines. This paper focuses on the routing, scheduling, and loading problems of a single towed train that transports parts from one supermarket to the workstation buffer in a mixed-flow assembly line and aims to optimize the loading of the tow train, the optimal delivery schedule and route, and the appropriate departure time to minimize shipping and line inventory costs. To enable part feeding in line with the just-in-time (JIT) principle, a new mixed-integer mathematical model from nonlinearity to linearity and a novel artificial immune genetic algorithm-based heuristic are proposed. Both methods can provide reasonable solutions compared by minimizing the route length and inventory level in terms of speed, and the genetic algorithm shows better performance on a large scale.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Reference26 articles.
1. Effective material handling system for JIT automotive production line;Halim;Procedia Manuf.,2015
2. A complete design methodology for lean in-plant logistics to assembly line using ad principles;Durmusoglu;Int. J. Ind. Eng.,2019
3. Optimisation of mixed-model assembly line balancing problem under uncertain demand;Liu;J. Manuf. Syst.,2021
4. Yin, Q., Luo, X., and Hohenstein, J. (2021). Design of mixed-model assembly lines integrating new energy vehicles. Machines, 9.
5. A modified particle swarm optimisation algorithm to solve the part feeding problem at assembly lines;Fathi;Int. J. Prod. Res.,2016
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献