1. Data acquisition technology (DAT) selection algorithm for automated progress measurement and management;Kang;Korea J. Constr. Eng. Manag.,2012
2. Kang, S.H. (2008). Utilizing Data Acquisition Technology (DAT) for Automated Construction Progress Management. [Master’s Thesis, Myungji University].
3. Kim, S.H. (2019). The Construction Project EV Tracking Process based on the 3D Point Cloud and 4D BIM. [Ph.D. Thesis, Yeungnam University].
4. A study on the improvement of construction progress management for EVMS;Lee;Korea J. Constr. Eng. Manag.,2002
5. Park, J.S. (2011). A Study on the Schedule Process for Forecasting Progress Rate for Construction Project. [Master’s Thesis, Gyeongsang National University].