1. A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
2. Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study
3. Ciavotta, M., Ruiz, R. & Minella, G. (2009). New results for the multi-objective sequence dependent setup times flowshop problem. Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2009), Dublin, Ireland, Dublin, Ireland, 10-12 August.
4. A fast and elitist multiobjective genetic algorithm: NSGA-II
5. Deng J. & Wang L. (2017). A competitive memetic algorithm for multi-objective distributedDhingra, A. & Chandna, P. (2009). Hybrid genetic algorithm for multicriteria scheduling with sequence dependent setup time. International Journal of Engineering (IJE), 3(5), 510-520. Erişim adresi: https://www.cscjournals.org/manuscript/Journals/ IJE/Volume3/ Issue5/IJE-112.pdf