Author:
Carmichael David G.,Bustamante Bianca L.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Project Delivery—PPP Concession Periods;Future-proofing—Valuing Adaptability, Flexibility, Convertibility and Options;2019-11-28
2. A Common and General Formulation;Future-proofing—Valuing Adaptability, Flexibility, Convertibility and Options;2019-11-28
3. Single Treatment of PPP Road Project Options;Journal of Construction Engineering and Management;2019-02
4. Estimating the Value of Built-In Flexibility in Infrastructure;Construction Research Congress 2018;2018-03-29
5. Uncertainties related to financial variables within infrastructure life cycle costing: a literature review;Structure and Infrastructure Engineering;2017-12-22