1. Arudi R. S. Pant P. D. Bodocsi A. and Aktan A. E. (
1994). “Planning and implementing a management system for utility cuts in city streets.” Infrastructure: New materials and methods of repair Proc. 3rd Mat. Engrg. Conf. ASCE New York 764–771.
2. Baim E. J. (
1998). “Risk factors which potentially influence the cost effective management and maintenance of urban infrastructure.” MS thesis Dept. of Civ. and Envir. Engrg. Polytechnic University Brooklyn N.Y.
3. Briaud J. L. James R. Hoffman S. and NCHRP. (
1997). Settlement of bridge approaches (The bump at the end of the bridge)—Synthesis of highway practice 234 National Research Council Washington D.C.
4. Burns E. and NCHRP. (
1990). Managing urban freeway maintenance—Synthesis of highway practice 170 National Research Council Washington D.C.
5. Crouch E. A. C. and Wilson R. (
1982). Risk / benefit analysis Ballinger Publishing Cambridge Mass.