1. Barker P. (1997). “Containment barrier at Pride Park Derby England.” Proc. 1997 Int. Containment Technology Conf. St. Petersburg Fla.
2. Building Research Establishment (BRE). (1994). “Slurry trench cut-off walls to contain contamination.” BRE Digest 395 July.
3. The Institution of Civil Engineers, the Construction Industry Research and Information Association, and the Building Research Establishment;Doe G.,1999
4. Evans J. C. and Dawson. A. R. (1999). “Slurry walls for control of contaminant migration: A comparison of U.K. and U.S. practices.” ASCE Specialty Conference on Geo-Engineering for Underground Facilities ASCE Geotechnical Special Publication No. 90. Reston Va. 105–120.
5. Evans J. C. (1994). “Hydraulic conductivity of vertical cut-off walls.” Hydraulic Conductivity and Waste Contaminant Transport in Soils ASTM STP 1142 D. E. Daniel and S. J. Trautwein eds. American Society for Testing and Materials Philadelphia 79–94.