1. Bailey D. M. (1989). “ROOFER: An engineered management system (EMS) for bituminous built-up roofs.” U.S. Army Corps of Engineers Construction Engineering Research laboratories (USACERL) Technical Rep. M-90/04 U.S. Government Printing Office 1993-3510-S/8013.
2. Coffelt D. (2008). “Roof management improvement: Improving infrastructure management decision making through a consideration of total life cycle cost and deterioration.” Ph.D. dissertation Carnegie Mellon Univ. Pittsburgh.
3. Coffelt D. and Hendrickson C. T. (2008). “Inspection condition assessment and management decisions for commercial roof systems.” J. Archit. Eng.JAEIED1076-0431 accepted.
4. Construction Engineering Research Laboratory (CERL). (2009). “ROOFER-Engineered Management System.” U.S. Army Corps of Engineers ⟨http://www.cecer.army.mil/td/tips/product/details.cfm?ID=101⟩ (June 11 2009).
5. Kyle B. R. (2002). “The BELCAM Project: A summary of three years of research in service life prediction and information technology.” Proc. 9th Int. Conf. on the Durability of Building Materials and Components National Research Council Canada (NRCC) Ottawa Ontario Canada.