1. AfDB (African Development Bank). (2014). “Study on Road Infrastructure Costs: Analysis of Unit Costs and Cost Overruns of Road Infrastructure Projects in Africa.” AfDB Market Study Series.
2. Reliability Analysis of Pier Scour at Gravel-Bed Rivers Using FORM.;Ahmad A.;International Journal of Recent Research Aspects,2016
3. Cost Estimation Methods for Transport Infrastructure: A Systematic Literature Review.;Barakchi M.;Procedia Engineering,2017
4. Preliminary cost estimating for highway construction projects.;Bell L. C.;AACE Transactions,1987
5. Cheng S. T. (1982). Overtopping risk evaluation for an existing dam . Ph.D. thesis Dep. of Civil Eng. Univ. of Ill. at Urbana-Champaign.