1. Bennett R.D. and Ariaratnam S.T. (2008) Horizontal Directional Drilling Good Practices Guidelines 3rd Edition HDD Consortium Washington DC p 10-12.
2. Cao H. Ariaratnam S.T. and Lueke J.S. etal (2011) A Parametric Study of Underground Utility Infrastructure in China. ICPTT 2011 Conference ASCE.
3. Lu Q. (2004) Research on the HDD path design and control technology thesis of National University of Defense Technology.
4. Niu H. L. (2005). Research on the Optimum Design of 3D Pilot-hole Borehole path in HDD [D]. China University of Geoscience.
5. Wang Y. Y. (2001). A nonlinear control design for HDD track following. IPEC 2001. Fifth International Power Engineering Conference. Proceedings 2001 pt. 1 278-282 vol.1.