1. Subsurface Exploration, HSL Pump Station, Missouri-American Water Central Plant, Chesterfield, Missouri;Geotechnology Inc;prepared by S. Kumar and J. A. Weinhold,2014
2. Jenevein Douglas R. Fong Mitchell L. Lee Thomas S. and Schnabel Harry W. (2015). "Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the BART Warm Springs Extension." Proc. Deep Foundations Institute (DFI) Deep Mixing Conference 2015 DFI San Francisco CA.
3. The Walworth Sewer, Cleveland, Ohio;Parmley Walter C;Proc., American Society of Civil Engineers, 31(6), ASCE, New York, NY,1905