1. Rehabilitation and strengthening of Yonghe Bridge in Tianjin;Li H. J.;World Bridges,2009
2. Technologies on Replacement of Structural Members in Prestressed Concrete Cable-Stayed Bridges;Li H. J.;Advanced Materials Research,2012
3. Study on the technology of replacement of closure segment for strengthening existing prestressed concrete cable stayed bridges;Li H. J.;China Civil Engineering Journal,2011
4. Status and Development of Technologies of Maintenance and Strengthening for Existing PC Cable-Stayed Bridges;Li H. J.;Proceedings of the 10th International Conference of Chinese Transportation Professionals, ASCE,2010
5. Structural Inverse Conversion Analysis on Removal of Closure Segment in prestressed concrete cable-stayed bridges;Li H. J.;Proceedings of 12th Cota International Conference of Transportation Professionals, ASCE,2012