1. Adi, T. J. W., and S. Yunwanti. 2014. “Pemodelan estimasi biaya kontingensi berbasis risiko pada proyek engineering-procurement-construction.” [In Indonesian.] Infrastruktur: Teknik Sipil 4 (1): 50–57.
2. Alsan R. 2014. “Faktor-Faktor Risiko Pada Tahap Eksekusi Proyek di Konstruksi EPC Yang Berpengaruh Kepada Kinerja Waktu (Berbasis PMBOK Guide 2008) Studi Kasus PT. X dan PT. Y.” [In Indonesian.] Master’s thesis Engineering Faculty Universitas Indonesia.
3. Beckers F. N. Chiara A. Flesch J. Maly E. Silva and U. Stegemann. 2013. “A risk-management approach to a successful infrastructure project Initiation financing and execution.” Accessed August 25 2022. https://www.mckinsey.com/business-functions/operations/our-insights/a-risk-management-approach-to-a-successful-infrastructure-project.
4. Boateng, P., Z. Chen, and S. O. Ogunlana. 2017. Megaproject risk analysis and simulation: A dynamic systems approach. Bingley, UK: Emerald.
5. Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study;Derakhshanalavijeh R.;J. Civ. Eng. Manage.,2013