Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
Author:
Affiliation:
1. Associate Professor, Dept. of Structural Engineering, Faculty of Engineering, Tanta Univ., Tanta, Egypt.
Publisher
American Society of Civil Engineers (ASCE)
Subject
Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering
Link
http://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29CO.1943-7862.0000256
Reference27 articles.
1. Discussion of “Flexible Model for Time/Cost Tradeoff Problem” by John Moussourakis and Cengiz Haksever
2. Bank of Canada. (2008). “Prime business.” Prime rate ⟨http://www.bankofcanada.ca/en/rates/digest.html⟩ (April 10 2008).
Cited by 46 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Augmented Time–Cost Trade-Off Optimization Using Particle Swarm Optimization;Journal of Construction Engineering and Management;2024-05
2. Quantitative Assessment of Activity Method Alternatives Based on Project Planning and Scheduling Under Time-Window Constraints;2024
3. An optimization model for energy project scheduling problem with cost-risk-quality-social consideration trade-off under uncertainty: A real-world application;Energy Strategy Reviews;2023-11
4. Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling;Jordan Journal of Civil Engineering;2023-04-01
5. Systematic Review of the Time-Cost Optimization Models in Construction Management;Sustainability;2023-03-22
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3