1. Barron R. F. Wright J. Kramer C. Andrew W. H Fung H. and Liu C. (2006). "Cement Deep Soil Mixing Remediation of Sunset North Basin Dam" Dam Safety 2006 Association of Dam Safety Officials.
2. Briaud J. L. James R. W. and Hoffman S. B. (1997) NCHRP synthesis 234: Settlement of Bridge Approaches (the bump at the end of the bridge) Transportation Research Board National Research Council Washington D.C. pp.75.
3. Bruce D. (2001). "An Introduction to the Deep Mixing Methods as Used in Geotechnical Applications. Volume III. The Verification and Properties of Treated Ground." Rep. No. FHWA-RD-99-167 US Department of Transportation Federal Highway Administration.
4. Filz G.M. Hodges D.E. Weatherby D.E. and Marr W.A. (2005). "Standardized Definitions and Laboratory Procedures for Soil-Cement Specimens Applicable to the Wet Method of Deep Mixing " Innovations in Grouting and Soil Improvement GSP 136 ASCE Reston Virginia 13 p.
5. Greimann L. F. Abendroth R.E. Johnson D.E. and Ebner P.B. (1987). "Pile Design and Tests for Integral Abutment Bridges." Final Rep. Iowa DOT Project HR 273 ERI Project 1780 ISU-ERI-Ames-88060 Ames Iowa.