1. Abudayyeh O. Y. and Rasdorf W. J. (1991). “Integrated cost and schedule control automation.” Preparing for construction in the 21st century (Proc. Constr. Congress '91) L. M. Chang ed. ASCE 679–686.
2. Abu‐Hijleh S. F. (1991). “A model for variance‐based exception reporting with user‐defined criteria.” Technical Report No. 18 Univ. of California Berkeley Calif. May.
3. Bernstein L. S. (1983). “Physical completion measuring techniques.” Current practice in cost estimating and cost control (Proc. Specialty Conf.) ASCE 147–161.
4. Carr R. I. (1991). “Integration of cost and schedule control.” Preparing for construction in the 21st century (Proc. Constr. Congress'91) L. M. Chang ed. ASCE 687–692.
5. “Cost and schedule control system criteria for contract performance measurement: Implementation guide.” (1980). Document No. DOE/CR‐0015 U.S. Dept. of Energy Washington D.C. May.