1. Alarcón-Cárdenas L. F. (1992). “Project performance modeling: a methodology for evaluating project execution strategies ” PhD dissertation Dept. of Civil Engineering University of California Berkeley.
2. Alarcón-Cárdenas L. F. and Ashley D. B. (1992). “Project performance modeling: a methodology for evaluation project execution strategies.” Rep. Prepared for Constr. Industry Inst. Univ. of Texas at Austin ; Source Document 80 .
3. Ashley D. B. and Alarcón-Cárdenas L. F. (1990). “A pilot study on construction incentives.” Rep. Prepared for CII Proj. Team Risk/Reward Task Force .
4. Bennett P. (1980). “Reflections on construction productivity.” Constr. Productivity Frontiers Technol. 5–9.
5. Business Roundtable. (1983). “More construction for the money: summary report of the construction industry cost effectiveness project.” New York N.Y.