1. “AIA/AGC recommended guidelines for procurement of design-build projects in the public sector.” Rep. Am. Inst. of Arch. Washington D.C.
2. Cook R. H. and Smith J. J. (1984). “Turnkey procurement consideration for management.” Naval Facilities Engrg. Command Alexandria Va.
3. “Design-build delivery assessment.” (1993). General Services Admin. Public Build. Services Washington D.C.
4. “Design-build in the federal sector a report of the task committee on design-build.” (1992). Rep. ASCE New York.
5. Are Contract Disputes Predictable?