1. Planning Construction of Repetitive Building Units
2. Chehayeb N. N. (1995). “Simulation-based project control ” PhD/thesis Univ. of Alberta Edmonton Alberta Canada.
3. Fiedler K. (1985). “Special conditions for time scheduling of building modernization projects.” Proc. 8th Conf. on Internet . Dutch Proj. Mgmt. Soc. Vol. 2 461–468.
4. Halpin D. W. (1973). “An investigation of the use of simulation networks for modeling construction operations ” PhD thesis Univ. of Illinois at Urbana-Champaign Ill.
5. Halpin D. W. (1990a). MicroCYCLONE system manual . Div. of Constr. Engrg. and Mgmt. Purdue Univ. West Lafayette Ind.