1. Buss W. “Proof of Leakage Rate of a Concrete Reactor Building ” Paper 34–61 Concrete For Nuclear Reactors ACI Special Publication Sp‐34 Vol. III 1972 pp. 1291–1320.
2. John J. E. A. Gas Dynamics Allyn and Bacon Boston 1969.
3. Leonhardt F. “Crack Control in Concrete Structures ” IABSE Surveys S‐4/77 IABSE Periodica 3/1977 International Association for Bridge and Structural Engineering Zurich Aug. 1977.
4. MacGregor J. G. Rizkalla S. H. and Simmonds S. H. “Cracking of Reinforced and Prestressed Concrete Wall Segments ” Structural Engineering Report No. 82 Dept. of Civ. Engrg. Univ. of Alberta Edmonton Canada Mar. 1980.