1. Aleithawe I. (2010). “Acquisition of right of way for highway construction.” Ph.D. thesis Mississippi State Univ. Oktibbeha MS.
2. Optimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi
3. Right-of-way acquisition duration prediction model for highway construction projects;Aleithawe I.;J. Constr. Eng. Manage.,2011
4. FHWA (Federal Highway Administration). (1971). “Uniform Act Section 301 49 CFR 24.104 ” Washington DC.
5. FHWA (Federal Highway Administration). (2002). “European right-of-way and utility best practices.” Publication FHWA-PL-02-013 U.S. Dept. of Transportation Washington DC.