Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects

Author:

Choi Kunhee1234,Kwak Young Hoon1234,Pyeon Jae-Ho1234,Son Kiyoung1234

Affiliation:

1. Assistant Professor, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Langford Building A429, College Station, TX 77843-3137 (corresponding author).

2. Associate Professor, Dept. of Decision Sciences, School of Business, George Washington Univ., 2201 G Street, NW, Washington, DC 20052.

3. Assistant Professor, Dept. of Civil & Environmental Engineering, San Jose State Univ., One Washington Square, San Jose, CA 95192.

4. Ph.D. Candidate, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Langford Building A128, College Station, TX 77843-3137.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering

Reference23 articles.

1. Incentive/Disincentive Provisions in Highway Contracts

2. State-of-Practice of Warranty Contracting in the United States

3. Christiansen D. L. (1987). “An analysis of the use of incentive/disincentive contracting provisions for early project completion.” Proc. National Conf. on Corridor Traffic Management for Major Highway Reconstruction Special Rep. 212 Transportation Research Board Washington DC.

4. Ellis R. Pyeon J. Herbsman Z. Minchin E. and Molenaar K. (2007). “Evaluation of alternative contracting techniques on FDOT construction projects.” Technical Report Florida Dept. of Transportation Tallahassee FL.

5. Federal Highway Administration (FHWA). (1998). “FHWA initiatives to encourage quality through innovative contracting practices.” Special Experimental Projects No. 14 (SEP-14) U.S. Dept. of Transportation Washington DC.

Cited by 26 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. An Evaluation of the Economic Viability and Accessibility of CRCP and JPCP: A Comparative Analysis;Sustainability;2024-01-28

2. Project Phase–Based Contingency Adjustment Framework for Infrastructure Renewal Projects;Journal of Construction Engineering and Management;2023-02

3. Statistical Comparison of the Performance of Alternative Contracting Methods in Florida;Transportation Research Record: Journal of the Transportation Research Board;2022-12-06

4. Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times;Journal of Management in Engineering;2022-11

5. Procurement Benchmarks for Major Transportation Projects;Transportation Research Record: Journal of the Transportation Research Board;2022-05-24

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3