Impact of Skilled Labor Availability on Construction Project Cost Performance

Author:

Karimi Hossein1ORCID,Taylor Timothy R. B.2,Dadi Gabriel B.3,Goodrum Paul M.4,Srinivasan Cidambi5

Affiliation:

1. Postdoctoral Associate, School of Civil Engineering, College of Engineering, Univ. of Tehran, 16 Azar Ave., P.O. BOX 14395-477, Tehran, Iran (corresponding author). ORCID: .

2. Associate Professor and Terrell-McDowell Chair of Construction Engineering and Project Management, Dept. of Civil Engineering, Univ. of Kentucky, Lexington, KY 40506-0281.

3. Assistant Professor, Dept. of Civil Engineering, Univ. of Kentucky, Lexington, KY 40506-0281.

4. Nicholas R. Petry Professor in Construction Engineering and Management, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, Boulder, CO 80309.

5. Professor, Dept. of Statistics, Univ. of Kentucky, Lexington, KY 40506-0281.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering

Reference36 articles.

1. Abdol R. C. H. B. Brisbane and G. D. Eric. 1999. “Causes of the construction skilled labor shortage and proposed solutions.” In Proc. ASC 35th Annual Conf. 187–196. San Luis Obispo CA: California Polytechnic State Univ.

2. Analysis of factors influencing project cost estimating practice

3. Transferability and updating of disaggregate travel demand models;Atherton T.;Transp. Res. Rec.,1976

Cited by 83 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3