1. Aninthaneni P. K. Dhakal R. P. and Marshall J. (2014). “Feasibility of pinned-base connections for demountable precast frame building systems.” Proc. 23rd Australasian Conf. Mechanics of Structures and Materials (ACMSM) Southern Cross Univ. Linsmore Australia.
2. Aninthaneni P. K. Dhakal R. P. Marshall J. and Bothara J. (2015). “Seismic performance of sub-assembly of a demountable precast concrete frame building.” Proc. 10th Pacific Conf. Earthquake Engineering: Building an Earthquake-Resilient Pacific Australian Earthquake Engineering Society McKinnon Australia Paper 189.
3. Aninthaneni P. K. Dhakal R. P. Marshall J. and Bothara J. (2016). “Experimental investigation of dry beam-column moment connections for demountable precast concrete RC frame buildings.” Proc. New Zealand Society for Earthquake Engineering Annual Conf. (NZSEE) New Zealand Society for Earthquake Engineering Wellington New Zealand.
4. Aninthaneni P. K. Dhakal R. P. Marshall J. and Bothara J. (2017). “Seismic performance of beam-column sub-assemblies of a demountable precast concrete frame building.” Proc. 16th World Conf. Earthquake (WCEE) International Association for Earthquake Engineering Tokyo.
5. Industrialized Building Systems Construction in Malaysia