Author:
Memon Zubair Ahmed,Majid Muhd Zaimi Abd.,Mustaffar Mushairry
Publisher
American Society of Civil Engineers
Reference20 articles.
1. Abd.Majid M.Z. Memon Z.A. and Mustaffar M. (2004). "Conceptual digital monitoring model for evaluating the progress of work." Proceedings of 4 th conference of construction applications of virtual reality (CONVR) 13-15 September 2004 at ADETTI/ISCTE Lisbon Portugal pp.161-166.
2. Linking Time-Lapse Digital Photography and Dynamic Scheduling of Construction Operations
3. Abeid J.N. Allouche E. Arditi D. and Hayman M. (2003). "PHOTO-NET II: a computer-based monitoring system applied to project management." Automation in construction Volume 12 Issue 5 603-616.
4. Baker B.N. Murphy D.C. and Fisher D. (1983). "Factors affecting project success". Project management handbook. Van Nostrand Reinhold New York.
5. Partnering on MTR Corporation Ltd’s Tseung Kwan O Extension
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献