1. Aubertin M. Li L. Arnoldi S. Belem T. Bussière B. Benzaazoua M. and Simon R. (2003). “Interaction between backfill and rock mass in narrow stopes.” Proc. SoilRock2003: 12th Panamerican Conference on Soil Mechanics and Geotechnical Engineering and 39th U.S. Rock Mechanics Symposium Vol. 1 P. J. Culligan H. H. Einstein and A. J. Whittle eds. Verlag Glückauf Essen VGE Essen Germany 1157–1164.
2. Beddoes R. J. Roulston B. V. and Streisel J. (1989). “Field monitoring of salt tailings used as backfill in cut-and-fill potash mining.” Proc. Innovations in Mining Backfill Technology Proc. of the 4th International Symp. on Mining with Backfill. A. A. Balkema Rotterdam Netherlands 343–348.
3. Results of a rock engineering monitoring programme at West Driefontein Gold Mine;Gürtunca R. G.;J. S. Afr. Inst. Min. Metal.,1991
4. Hassani F. Ouellet J. and Servant S. (2001). “In situ measurements in a paste backfill: Backfill and rock mass response in the context of rockburst.” Proc. 17* Int. Mining Congress and Exhibition of Turkey- IMCET2001 Chamber of Mining Engineers of Turkey.
5. Herget G. and Munroe S. R. (1989). “Utilization of salt tailings backfill at Denison-Potacan Potash Company.” Innovations in Mining Backfill Technology Proc. of the 4th International Symp. on Mining with Backfill. A. A. Balkema Rotterdam Netherlands 335–342.