ENERGY POTENTIAL OF DISTRIBUTED GENERATION AT POWERFUL BOILER HOUSES OF UKRAINE IN CONDITIONS OF MILITARY AGGRESSION

Author:

Teslenko O.I.ORCID

Abstract

The Integrated Power System of Ukraine (IPS) is purposefully destroyed by the russian aggressor and suffers significant damage, which has caused long-term emergency interruptions in the power supply of critical infrastructure facilities, enterprises and the population. One of the ways to increase the stability of the IPS of Ukraine is to increase the share of distributed generation in its composition. The conceptual idea of solving this problem is the transformation of existing critical infrastructure objects from electricity consumers into electricity producers/suppliers who will provide their own electricity needs and the needs of other electricity consumers. Boiler houses of centralized heat supply systems (DHS) of Ukrainian cities with their existing electric power and fuel infrastructure can become such objects in wartime conditions. The author proposes the widespread introduction of energy-efficient cogeneration gas-piston units (CGPUs) at boiler houses of the DHS. The container-type CGPU is a typical mass-produced equipment that is manufactured in Ukraine and abroad and has a short implementation period (up to 5 days from the date of delivery to the industrial site of the boiler house). The high maneuverability of the CGPUs allows for an increase the flexibility of the IPS of Ukraine. The article presents the main technical and economic indicators of distributed generation with the use of CGPU at existing boiler houses for further national planning of the development of distributed generation during the martial law and post-war reconstruction of Ukraine. The application of CGPU at boiler houses of the DHS of Ukrainian cities has the potential to provide additional distributed generation with a total capacity of up to 2365.7 MW, in particular, 1224.8 MW at 158 boiler houses with a thermal capacity of 100 Gcal/h and more (612 CGPUs with an average unit electric power of 2.0 MW each); 561.9 MW at 409 boiler houses from 20 to 100 Gcal/h (803 CGPUs of 0.7 MW each); 561.9 MW in 2101 boiler houses from 3 to 20 Gcal/h (4136 CGPUs of 0.14 MW each). Under the conditions of 8 hours a day of use of the installed capacity of CGPUs, 567.8 thousand MWh of electricity will be produced every month at the boiler houses of the DHS (taking into account the consumption of the boiler houses for their own needs and release to the network to other consumers) and 136–142 million cubic meters of natural gas will be consumed. According to the average specific cost of modular CGPU (turnkey supply) from 800 to 950 USD/kW of installed electric capacity, capital costs for implementing the CGPUs with a total capacity of 2,365.7 MW will amount to USD 1.89–2.25 billion. Bibl. 31, Fig. 3.

Publisher

The Gas Institute of the National Academy of Sciences of Ukraine

Reference31 articles.

1. Guan, F.H., Zhao, D.M., Zhang, X., Shan, B.T., and Liu, Z. (2009). Research on distributed generation technologies and its impacts on power system. International Conference: Sustainable Power Generation and Supply SUPERGEN’09 (2009, May). IEEE Xplore. — DOI: 10.1109/SUPERGEN.2009.5348241.

2. Directive (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity and amending Directive 2012/27/EU. — https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32019L0944

3. [On Electricity Market: Law of Ukraine of 13.04.2017 No 2019-VIII]. Vidomosty Verkhovnoi Rady. [The Official Bulletin of the Verkhovna Rada of Ukraine]. 2017. No. 27–28. — https://zakon.rada.gov.ua/laws/show/2019-19#Text (Ukr.)

4. Kyrylenko, O.V., and Prakhovnyk, A.V. (2010). [Energy of sustainable development: challenges and ways of construction]. [Proceedings of the Institute of Electrodynamics of NAS of Ukraine. Special issue]. pp. 10−16. (Ukr.)

5. Kyrylenko, O.V., Pavlovskyi, V.V., and Lukianenko, L.M. (2011). [Technical aspects of adoption of distributed generation sources in electric mains]. Tekhnichna elektrodynamika. No. 1. pp. 46–53. . — http://dspace.nbuv.gov.ua/handle/123456789/61941 (Ukr.)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3