1. Joint Model of Probabilistic-Robust (Probust) Constraints Applied to Gas Network Optimization;Adelhütte, Dennis;Vietnam J. Math.,2021
2. From Feasibility to Improvement to Proof: Three Phases of Solving Mixed-Integer Programs;Berthold, Timo;Optim. Methods Softw.,2018
3. [3] Bestuzheva, Ksenia; Besançon, Mathieu; Chen, Wei-Kun; Chmiela, Antonia; Donkiewicz, Tim; van Doornmalen, Jasper; Eifler, Leon; Gaul, Oliver; Gamrath, Gerald; Gleixner, Ambros; Gottwald, Leona; Graczyk, Christoph; Halbig, Katrin; Hoen, Alexander; Hojny, Christopher; van der Hulst, Rolf; Koch, Thorsten; Lübbecke, Marco; Maher, Stephen J.; Matter, Frederic; Mühmer, Erik; Müller, Benjamin; Pfetsch, Marc E.; Rehfeldt, Daniel; Schlein, Steffan; Schlösser, Franziska; Serrano, Felipe; Shinano, Yuji; Sofranac, Boro; Turner, Mark; Vigerske, Stefan; Wegscheider, Fabian; Wellner, Philipp; Weninger, Dieter; Witzig, Jakob The SCIP Optimization Suite 8.0 (2021) no. 21-41 (ZIB-Report)
4. Time Aggregation for Network Design to Meet Time-Constrained Demand;Boland, Natachia;MODSIM 2013: 20th International Congress on Modelling and Simulation - Adapting to Change: The Multiple Roles of Modelling,2013
5. On Mathematical Programming with Indicator Constraints;Bonami, Pierre;Math. Program.,2015