Research on each actor's awareness of procurement methods involving contractors and consultants in the design phase: Based on interviews with persons in charge

Author:

Abe Riho1ORCID,Saito Yuki2,Shide Kazuya3ORCID

Affiliation:

1. Design Division Head Office Takenaka Corporation Tokyo Head Office Koto‐ku Japan

2. Cost Management Group Nikken Sekkei Ltd Chiyoda‐ku Japan

3. School of Architecture Shibaura Institute of Technology Koto‐ku Japan

Abstract

AbstractThis paper analyzes the benefits and problems of the early involvement contractor into projects and the use of project managers from the perspective of each stakeholder. Interviews were conducted with clients, architects, general contractors, and outsourced owner's representative firm as a PM/CM consultants to compare each stakeholder's responses regarding the early involvement of general contractors into projects and the use of outsourced owner's representatives to identify the benefits and problems. The possibility that these two trends can coexist and complement each other's issues was indicated and the characteristics of the expected role of outsourced owner's representatives in Japan were also pointed out.

Publisher

Wiley

Subject

Modeling and Simulation,Architecture,Environmental Engineering

Reference11 articles.

1. Ministry of Land Infrastructure Transport and Tourism: Guidelines for Ensuring Proper Quality of Private Construction Work 2016.7.https://www.mlit.go.jp/common/001138786.pdf. Accessed December 2 2020.

2. Ministry of Land Infrastructure Transport and Tourism: Ministry of Land Infrastructure Transport and Tourism Notification #98 2019.https://www.mlit.go.jp/common/001269165.pdf. Accessed December 2 2020.

3. Ministry of Land Infrastructure Transport and Tourism: Guidelines for the Application of the Bidding Contract Method of Public Construction Work 2015.5.https://www.mlit.go.jp/tec/content/001475361.pdf. Accessed December 2 2020.

4. GAPS BETWEEN CLIENT'S REQUEST AND BUILDER'S PRESENTATION IN BUILDING PROJECTS BY DESIGN BUILD CONTRACT

5. AN ANALYSIS ON CASES OF BUILDING WORKS TO WHICH ECI METHOD IS APPLIED IN JAPAN

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3