Author:
Rojas Fabian,Naeim Farzad,Lew Marshall,Carpenter Lauren D.,Youssef Nabih F.,Saragoni G. Rodolfo,Adaros Macarena Schachter
Subject
Building and Construction,Architecture,Civil and Structural Engineering
Reference23 articles.
1. Did the large coseismic displacement cause the global overturning collapse of the Alto Rio building during the 27 February 2010 offshore Maule, Chile earthquake?;Alimoradi;The Structural Design of Tall and Special Buildings,2010
2. Betanzo R. 2010 Daños del Terremoto del 27 de Febrero de 2010 en el Gran Concepcion urbano e industrial Proceedings of the 10th Congreso Chileno de Sismologia e Ingeniria Antisimica, 22 al 27 de Mayo de 2010
3. Concepcion under Construction 2010 http://concepcionunderconstruction.blogspot.com/search/label/Alto%20Rio
4. El Mercurio 2010 Cuerpo El Mercurio Newspaper
Cited by
44 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献